Wastewater Project Bid Info:

Bid Package (56mb)
Addendum 02
Addendum 03
Addendum 04
Addendum 05
Addendum 06
Addendum 07
Addendum 08



The Work associated with this project will consist of, but is not limited to, the furnishing of all labor, material, equipment, and supervision for the demolition and disposal of existing facilities, retrofit of an
existing wet well with submersible pumps; pump station and treatment plant site improvements; installation of septage screening and holding tank system; and installation of, pumps, controls, aerators,
monitoring wells, fencing, septage tank risers, and air release valves and replacement of electrical service
panels in multiple locations within the MCSD’s service boundary.

A non-mandatory pre-bid conference will be held on site at 10:00 a.m. on Friday, September 20th, 2024 PDT. Interested parties can meet at the MCSD Office located at 1901 Park Street, Arcata, CA 95521.

The Engineer’s Estimate for this project is $2,750,000


Board Meetings are held hybrid every third Tuesday at 1611 Peninsula Drive
and can be accessed remotely here
https://us02web.zoom.us/j/3742372467

Agendas, Packets and other District Information:


September 17th, 2024 meeting canceled


July meeting canceled



April Canceled


District Audits:

2022
2021 
2020
2019
2018
2017

Zoom Meetings:
May 21, 2024
Passcode: &94Df3HH

Free AI Website Maker